The course is also designed for engineers and field personnel involved in the planning and implementation of drilling programs. The course covers all aspects of drilling technology, emphasizing both theory and practical application.
Computer programs are used to design many aspects of the modern well and the course will provide the participants with the theory behind most programs along with practical implementation. This training course builds a firm foundation in the principles and practices of drilling and well planning, drilling fluid, drill string design, hydraulic optimization, and drilling hole problems. Participants will learn the components of the drilling string and how to use each in optimum ways, how to evaluate the WOB, and select the proper size of the drill collar. Participants will also be able to apply the practical solution for analyzing the performance of drill string design for both vertical and direction holes.
By the end of this course, participants will be able to:
– Drill a well cost-effectively and maximize penetration rate & Evaluate stuck pipe
problems and avoid potential problems by optimizing hole cleaning and ROP.
– Design, drill string and BOP/wellheads & Design and implement bit and hydraulics
programs.
– BHA design for proper deviation, directional and horizontal drilling control &
Recognize and evaluate well control problems by effectively using Mud Logging
principles and techniques.
Training Methodology:
This course will be conducted along with formal lectures and interactive worked examples. Each learning point will be reinforced with practical examples and case studies. There will be active discussion and video presentations. The sharing professional experiences and exchange will help solidify the gained knowledge. All training course materials will be provided.
Day-1:
Drilling Hole Problems and Practical Solutions:
Day-2:
Preventing Wash out and Twist Off:
Day-3:
Drilling Fluids Planning and Control, Routine and Special Problems:
Well Control & Hydro-dynamic Pressure:
Day-4:
Day-5:
Planning including Mud Logging Requirements: